Line Movement

Not rated yet. Be the first who rates this item!

We are trying to determine where we are putting our new assembly cell and how we can save space.

D: move the line to warehouse two assembly
D': place the line next to the existing line
B: free up much needed floor space
C: have the line in place on time
A: Find the most optimal line space while keeping cost low
Click on the icons on the arrows to see assumptions and injections
In order to Find the most optimal line space while keeping cost low I must free up much needed floor space and in order to free up much needed floor space I must move the line to warehouse two assembly. But, in order to Find the most optimal line space while keeping cost low I must also have the line in place on time and in order to have the line in place on time I must place the line next to the existing line. I can't both move the line to warehouse two assembly and place the line next to the existing line.
RelationAssumption(s)Injection(s)
D-D'by putting the new line next to the old line we mess up product flow, and we loose our opportunity to reclaim the warehouseAlways true
B-Dwe loose too much time in material handling Always true
C-D'by moving both line we open 100,000 sqft of space for materialsThe space could be lost if someone says lets place something else here.
A-BAs of right now a lot of our problems is due to spaceAlways True
A-CSOP is in June Always true